Project Description:
Our project aims to save stranded citizens in water based disasters because current solutions are time consuming and equipment intensive. To solve this, we created a modular bridge with a detachable ladder at the end. It connects to a boat, where a first responder flips out three separate platforms which can easily adapt past debris. On the end of the furthest platform, first responders can attach a ladder which can swivel to different angles and can extend up to 22 feet.
Advisor/Instructor:
Mohammad FazelpourTeam Members:
| Valentin Lelchuk | Mechanical Engineering |
| Gracious Mudoh | Mechanical Engineering |
| Matthew Scholl | Mechanical Engineering |
| Steven Ying | Mechanical Engineering |